Hot
New
In stock
Out Stock
Heavy Duty Micro USB Charging Cable Braided Fast Phone Charger Long Lead 1m 2m 3m
SKU: UK_MCR_CBL_BRD_GRY_15CM
AVAILABILITY: In stock (1000 items)
VENDOR: TradeNRG UK
£1.99
PRODUCT INFORMATION
Heavy Duty Micro USB Charging Cable Braided Fast Phone Charger Long Lead 1m 2m 3m
Heavy Duty Micro USB Charging Cable Braided Fast Phone Charger Long Lead 1m 2m 3m
Description:
-
Designed for Save Charging and Sync Time - Lower resistance value pure copper wires inside ensures a maximum charging speed up to 2.4A, charge faster than most standard cables, and work better for tablets and quick charge devices. Transfer data up to 480 Mbits through wide diameter 28/21 AWG data and power wires.
-
Built to Last - Premium nylon braided exterior with pure copper wires inside and laser-welded put on connectors for maximum reliability and durability. Up to 15,000+ bend and 10,000+ plugging and unplugging lifespan.
-
Universal Compatibility - Perfect compatible with smartphones, tablets and other devices with micro USB connectors like Galaxy, HTC, Motorola, Nexus, Nokia, LG, Huawei, Sony, Blackberry, Kindle, Android smartphones and more.
-
Aluminum Shell - High-quality aluminium alloy shell, firmly connected, standard micro USB port, even with a protective cover can be well fixed, can provide safer and more reliable charging.
Item specifics :
Condition: |
New: A brand-new, unused, unopened and undamaged item in original retail packaging (where packaging is ... Read more
|
Brand: | Unbranded / Generic |
Colour: | Black, RoseGold, Grey, Red | Type: | Micro USB Cable |
Material: | Nylon | Connectivity: | Micro USB, Micro USB Cable, USB Cable |
Version: | Micro Speedy Cable | Items Included: | Charging |
Features: | Accessible Controls, Adjustable Angle, Braided, Non-Slip | Cable Length: | 15cm, 1M, 2M, 3M |
Country/Region of Manufacture: | China | Compatible Brand: | For ASUS, For Acer, For Alcatel, For Fujitsu, For Google, For HTC, For Hitachi, For Huawei, For LG, For Lenovo, For Motorola, For Nokia, For OPPO, For OnePlus, For Panasonic, For Samsung, For Sony, For Sony Ericsson, For Xiaomi, Universal |
Custom Bundle: | No | Compatible Model: | Universal |
American Wire Gauge (AWG): | 24C + 28D |
CUSTOMER REVIEWS
