Hot
New
In stock
Pre-order
Out stock

USB C Charger Cable Braided Fast Phone Charger Heavy-Duty Type C Charger Cable Long Lead 2m 3m

VENDOR: TradeNRG UK

£4.35​

Order in the next 0 hours 0 minutes to get it by         /10/2026
15cm
1M
2M
3M
Pastel Blue
Pastel Green
Purple
Dark Blue
Red
Black

Free shipping! Order by 1 PM for same-day dispatch.

Warranty: Comes with extended 36 Months Warranty upon registration.

We will beat any price. Peace of mind 30 days Returns.

PRODUCT INFORMATION
PRODUCT INFORMATION

Our USB-C Charger Cable provides unmatched durability and rapid charging. Made with heavy-duty braided material, it ensures long-lasting performance. Engineered for fast phone charging, it delivers swift power to your device, saving you time. Charge your device from a comfortable distance of 2m or 3m. Our reliable Type-C Charger Cable makes charging effortless, eliminating tangled cables. 

  • Fast Phone Charging Cable.
  • Braided Design Constructed with a durable braided exterior.
  • Tangle-Free Design. Reliable Performance.
  • Heavy-Duty Construction.
  • Type C Compatibility.
  • Long Lead Length: Available in 10cm, 1m, 2m and 3m lengths.
  • 5 stars: 1 (50%)
  • 4 stars: 1 (50%)
  • 3 stars: 0 (0%)
  • 2 stars: 0 (0%)
  • 1 star: 0 (0%)
L
Lucas

Quick, good quality

L
Lucas

Quick delivery, sturdy cables.
Feels like good quality

USB C Charger Cable Braided Fast Phone Charger Heavy-Duty Type C Charger Cable Long Lead 2m 3m - TradeNRG UK

USB C Charger Cable Braided Fast Phone Charger Heavy-Duty Type C Charger Cable Long Lead 2m 3m

£4.35​
15cm
1M
2M
3M
Pastel Blue
Pastel Green
Purple
Dark Blue
Red
Black